


{"id":33593,"date":"2026-08-17T10:27:22","date_gmt":"2026-08-17T02:27:22","guid":{"rendered":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/"},"modified":"2026-08-17T11:14:54","modified_gmt":"2026-08-17T03:14:54","slug":"semiconductor-price-increase-2026","status":"publish","type":"post","link":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/","title":{"rendered":"Microchip Price Increase 2026: PCBA Cost and Lead-Time Impact"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_85 ez-toc-wrap-left counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#What_Did_Microchip_Change_on_August_14_2026\" >What Did Microchip Change on August 14, 2026?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#How_Much_Did_Microchip_Prices_Increase\" >How Much Did Microchip Prices Increase?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#Did_the_Microchip_Price_Increase_Change_Lead_Times\" >Did the Microchip Price Increase Change Lead Times?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#Why_Does_a_Semiconductor_Price_Increase_Affect_PCBA_Manufacturing\" >Why Does a Semiconductor Price Increase Affect PCBA Manufacturing?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#How_Do_We_Calculate_the_PCBA_Cost_Impact\" >How Do We Calculate the PCBA Cost Impact?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#How_Does_Electronic_Component_Procurement_Change\" >How Does Electronic Component Procurement Change?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#How_Does_PCB_BOM_Management_Protect_Repeat_Orders\" >How Does PCB BOM Management Protect Repeat Orders?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#When_Should_We_Recommend_an_Alternative_Component\" >When Should We Recommend an Alternative Component?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#What_Are_We_Checking_at_EBest_Circuit_Now\" >What Are We Checking at EBest Circuit Now?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#What_Should_Customers_Send_for_a_Fast_PCBA_Requote\" >What Should Customers Send for a Fast PCBA Requote?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#FAQ_About_Semiconductor_Price_Increase_2026\" >FAQ About Semiconductor Price Increase 2026<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#How_Can_EBest_Circuit_Support_Your_PCBA_Project\" >How Can EBest Circuit Support Your PCBA Project?<\/a><\/li><\/ul><\/nav><\/div>\n<div class=\"yzp-no-index\"><\/div>\n<p>Microchip&#8217;s reported price adjustment took effect on August 14, 2026. For us as a PCBA manufacturer, the <a href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/\">semiconductor price increase 2026<\/a> is not merely a supplier announcement: it can change component cost, quotation validity, material reservation, substitute approval, and the date an SMT build can start.<\/p>\n\n\n\n<p>The most important answers are straightforward. For teams researching the <strong>microchip price increase 2026<\/strong>, Microchip has confirmed selective price increases across its broad portfolio, but it has not publicly stated one universal percentage for every affected part. The company linked the increase to broad-based input costs rather than a shortage. A general lead-time extension caused by this price change has not been officially announced, so we check price and availability separately for every manufacturer part number.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2026\/08\/semiconductor-price-increase-2026-hero.jpg\" alt=\"Semiconductor Price Increase 2026 flowing through a PCBA BOM, quotation, and SMT production plan\"\/><\/figure>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"What_Did_Microchip_Change_on_August_14_2026\"><\/span>What Did Microchip Change on August 14, 2026?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Microchip implemented selective price increases across its broad product portfolio, with supply-chain reports identifying August 14, 2026, as the effective date. In a June statement, <a href=\"https:\/\/ir.microchip.com\/news-events\/press-releases\/detail\/1395\/microchip-provides-data-center-solutions-business-unit-revenue-information\">Microchip said broad-based input cost pressures could no longer be fully absorbed<\/a> and that it was working on the specific increases to communicate to customers. A later <a href=\"https:\/\/www.ftcelectronics.com\/news\/market-insight-microchip-joins-the-latest-wave-of-semiconductor-price-adjustments\">electronics supply-chain report<\/a> identified selected products and the August 14 effective date.<\/p>\n<p>This timing matters to a PCBA order because a component quote issued before August 14 may not remain valid when the purchase order is released, the material is reserved, or a scheduled shipment falls after the change. We therefore treat the date as a mandatory BOM recheck point, not as permission to apply a blanket surcharge.<\/p>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"How_Much_Did_Microchip_Prices_Increase\"><\/span>How Much Did Microchip Prices Increase?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>There is no publicly confirmed universal Microchip increase percentage for all affected part numbers. Public reports conflict: some describe selected products, while others publish portfolio-wide percentages without a customer notice that can be verified. We do not apply those unverified figures to a PCBA quotation.<\/p>\n<div class=\"wp-block-table\">\n<table>\n<tbody>\n<tr>\n<td><strong>Question<\/strong><\/td>\n<td><strong>Verified answer<\/strong><\/td>\n<td><strong>How we handle it<\/strong><\/td>\n<\/tr>\n<tr>\n<td>When did the change take effect?<\/td>\n<td>August 14, 2026, according to multiple supply-chain reports<\/td>\n<td>Recheck every open RFQ and uncommitted order<\/td>\n<\/tr>\n<tr>\n<td>What is the percentage increase?<\/td>\n<td>No single public percentage is confirmed for all parts<\/td>\n<td>Compare old and new prices by manufacturer part number<\/td>\n<\/tr>\n<tr>\n<td>Are all Microchip products affected?<\/td>\n<td>Microchip says increases are selective across a broad portfolio<\/td>\n<td>Request the affected-part list from the authorized source<\/td>\n<\/tr>\n<tr>\n<td>Did lead time increase?<\/td>\n<td>No general extension is confirmed as part of this price action<\/td>\n<td>Check stock, allocation, and factory lead time separately<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>For a specific PCBA, the only defensible percentage is <strong>(new confirmed unit price \u2212 old comparable unit price) \u00f7 old unit price \u00d7 100%<\/strong>. Both prices must use the same part number, quantity break, currency, packaging, source, and commercial terms. If any of those fields differ, the calculated percentage can misstate the supplier&#8217;s actual adjustment.<\/p>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"Did_the_Microchip_Price_Increase_Change_Lead_Times\"><\/span>Did the Microchip Price Increase Change Lead Times?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>The price increase does not by itself prove that Microchip lead times became longer. In the company&#8217;s <a href=\"https:\/\/earningscalls.dev\/transcripts\/microchip-technology-incorporated_mchp_earnings_call_transcript_2026-06-02\">June 2026 earnings discussion<\/a>, management described lead times at roughly seven to eight weeks and said the planned increase was cost-driven, not caused by shortages. That was a company-wide snapshot, not a guarantee for every device or region.<\/p>\n<p>From our PCBA production perspective, the customer-visible schedule can still move even without a vendor-wide lead-time extension. A build may wait while we obtain a revised quote, reserve stock, approve a price change, or validate an alternate. One critical MCU can hold an SMT start even when the bare PCB, solder paste, passives, and most other components are ready.<\/p>\n<ul>\n<li><strong>Supplier lead time<\/strong> is the quoted time for a specific part and order quantity.<\/li>\n<li><strong>Material-ready date<\/strong> is when every production-critical BOM item is available and released.<\/li>\n<li><strong>PCBA lead time<\/strong> includes material readiness, PCB fabrication, SMT scheduling, assembly, inspection, testing, and shipment.<\/li>\n<\/ul>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"Why_Does_a_Semiconductor_Price_Increase_Affect_PCBA_Manufacturing\"><\/span>Why Does a Semiconductor Price Increase Affect PCBA Manufacturing?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>A semiconductor price change reaches PCBA manufacturing through the BOM before it reaches the SMT line. Components often represent a major share of turnkey assembly cost, and one MCU, FPGA, analog IC, or power-management device can carry more value than many passive lines combined.<\/p>\n<div class=\"wp-block-table\">\n<table>\n<tbody>\n<tr>\n<td><strong>Supply-chain change<\/strong><\/td>\n<td><strong>PCBA effect<\/strong><\/td>\n<td><strong>Our manufacturing action<\/strong><\/td>\n<\/tr>\n<tr>\n<td>New unit price<\/td>\n<td>BOM cost and quote margin change<\/td>\n<td>Requote the exact affected line<\/td>\n<\/tr>\n<tr>\n<td>Shorter quote validity<\/td>\n<td>Customer approval window narrows<\/td>\n<td>State validity and reconfirm at order release<\/td>\n<\/tr>\n<tr>\n<td>Stock reserved by other buyers<\/td>\n<td>Material-ready date may move<\/td>\n<td>Reserve approved stock after order confirmation<\/td>\n<\/tr>\n<tr>\n<td>Alternate proposed<\/td>\n<td>Engineering and test work may be required<\/td>\n<td>Hold substitution until written approval<\/td>\n<\/tr>\n<tr>\n<td>Unverified source offered<\/td>\n<td>Traceability and quality risk increase<\/td>\n<td>Do not trade sourcing control for a lower headline price<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The same event also affects the wider electronic components industry. Distributors revise cost files, OEMs review forecasts, contract manufacturers re-open BOMs, and demand may shift toward substitutes or available stock. This can create part-level volatility even when the supplier has not announced an industry-wide shortage.<\/p>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"How_Do_We_Calculate_the_PCBA_Cost_Impact\"><\/span>How Do We Calculate the PCBA Cost Impact?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>We calculate the change line by line instead of multiplying the complete assembly price by a rumored percentage. A useful <strong>bom cost analysis<\/strong> separates confirmed deltas, pending quotes, already purchased material, and customer-owned inventory.<\/p>\n<ol>\n<li>Freeze the BOM revision, build quantity, and currency.<\/li>\n<li>Filter all Microchip manufacturer part numbers and approved alternates.<\/li>\n<li>Mark each line as purchased, reserved, quoted, pending, or customer supplied.<\/li>\n<li>Compare old and new prices using the same quantity break and source terms.<\/li>\n<li>Multiply each confirmed unit delta by usage per PCBA and build quantity.<\/li>\n<li>Add only confirmed line deltas to the revised material cost.<\/li>\n<\/ol>\n<p>For example, if an MCU rises from $4.00 to $4.40 and one unit is used per board, the part-level increase is 10% and the PCBA material delta is $0.40 per board. If that MCU represents 20% of a $20 BOM, the total BOM rises by 2%, not 10%. Freight, MOQ, packaging, currency, yield reserve, and testing remain separate cost fields.<\/p>\n<p>This distinction is why a supplier&#8217;s part-level increase cannot be copied directly into a finished-PCBA percentage. The final effect depends on affected value as a share of the whole BOM and on how much material was already committed at protected pricing.<\/p>\n<figure style=\"max-width: 600px; margin: 24px auto; text-align: center;\"><figure><img decoding=\"async\" style=\"width: 100%; max-width: 600px; max-height: 400px; height: auto; object-fit: contain;\" src=\"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2026\/08\/pcba-bom-price-review.jpg\" alt=\"PCBA procurement and engineering team reviewing BOM prices and component reels\"><\/figure><\/figure>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"How_Does_Electronic_Component_Procurement_Change\"><\/span>How Does Electronic Component Procurement Change?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>Electronic component procurement<\/strong> becomes more evidence-driven after a price adjustment. We need a written, part-level commercial record before we change a customer quotation or release material for production.<\/p>\n<ul>\n<li>Exact manufacturer part number, revision, temperature grade, and package.<\/li>\n<li>Old and new unit price, currency, quantity break, MOQ, and pack quantity.<\/li>\n<li>Quotation date, validity period, stock location, and standard lead time.<\/li>\n<li>Rules for new orders, backlog, scheduled shipments, and price protection.<\/li>\n<li>Authorized source identity, date code, lot traceability, and warranty path.<\/li>\n<\/ul>\n<p>At EBest Circuit, our <a href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/03\/component-sourcing\/\">component sourcing process<\/a> connects this commercial evidence with BOM review and incoming inspection. We do not treat a distributor news headline as the price governing every customer&#8217;s order.<\/p>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"How_Does_PCB_BOM_Management_Protect_Repeat_Orders\"><\/span>How Does PCB BOM Management Protect Repeat Orders?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><strong>PCB BOM management<\/strong> protects repeat orders by keeping part, source, revision, price, lifecycle, and alternative data under change control. It does not prevent a supplier increase, but it shows exactly which previous assumptions are no longer valid.<\/p>\n<ul>\n<li>Use exact manufacturer part numbers instead of generic descriptions.<\/li>\n<li>Record approved alternates and do-not-substitute lines.<\/li>\n<li>Store source, date, price break, currency, and validity with each quotation.<\/li>\n<li>Flag sole-source, high-value, long-lead, allocation-prone, and EOL parts.<\/li>\n<li>Recheck critical lines before RFQ, order release, and every repeat build.<\/li>\n<\/ul>\n<p>A controlled file package also keeps component decisions aligned with fabrication and assembly. Our <a href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/07\/pcb-manufacturing-assembly-guide\/\">PCB manufacturing and assembly guide<\/a> explains how Gerber or ODB++, BOM, CPL, assembly drawings, firmware, and test instructions move together through a turnkey project.<\/p>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"When_Should_We_Recommend_an_Alternative_Component\"><\/span>When Should We Recommend an Alternative Component?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>We recommend an alternative when the cost or availability benefit justifies the engineering and qualification work. A lower price is not enough: the replacement must fit the electrical, mechanical, firmware, quality, lifecycle, and regulatory requirements of the finished product.<\/p>\n<ul>\n<li>Compare function, pinout, footprint, voltage, current, timing, memory, peripherals, and temperature grade.<\/li>\n<li>Check firmware, programming, bootloader, driver, and test-limit changes.<\/li>\n<li>Verify lifecycle, authorized availability, packaging, date code, and moisture sensitivity.<\/li>\n<li>Build engineering samples and complete required functional or environmental validation.<\/li>\n<li>Update the BOM, drawings, firmware revision, test plan, and approval record together.<\/li>\n<\/ul>\n<p>For a core MCU or FPGA, redesign cost and validation time may exceed the immediate price increase. For a support IC with an already approved second source, substitution may be much faster. We never change a customer-controlled component without written approval.<\/p>\n<figure style=\"max-width: 600px; margin: 24px auto; text-align: center;\"><figure><img decoding=\"async\" style=\"width: 100%; max-width: 600px; max-height: 400px; height: auto; object-fit: contain;\" src=\"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2026\/08\/pcba-material-readiness.jpg\" alt=\"PCBA production team checking component material readiness before SMT scheduling\"><\/figure><\/figure>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"What_Are_We_Checking_at_EBest_Circuit_Now\"><\/span>What Are We Checking at EBest Circuit Now?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>We are checking every affected PCBA project at the part, purchase, and production-plan level. The priority is not to spread a market headline across every quote; it is to identify the exact commercial exposure before it interrupts the build.<\/p>\n<ul>\n<li>Open RFQs with Microchip content and expired or near-expiry component quotes.<\/li>\n<li>Orders where critical ICs have not yet been purchased or reserved.<\/li>\n<li>Repeat builds using old BOM cost baselines.<\/li>\n<li>Sole-source parts without an approved alternative.<\/li>\n<li>High-value lines where a small percentage changes total program cost materially.<\/li>\n<li>Material-ready dates that depend on one unconfirmed device.<\/li>\n<\/ul>\n<p>Before SMT, we also verify incoming component identity, packaging, traceability, and condition. This control remains essential when price pressure makes unauthorized or poorly documented offers look attractive.<\/p>\n<figure style=\"max-width: 600px; margin: 24px auto; text-align: center;\"><figure><img decoding=\"async\" style=\"width: 100%; max-width: 600px; max-height: 400px; height: auto; object-fit: contain;\" src=\"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2026\/08\/incoming-semiconductor-inspection.jpg\" alt=\"Incoming semiconductor inspection and traceability check before PCBA assembly\"><\/figure><\/figure>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"What_Should_Customers_Send_for_a_Fast_PCBA_Requote\"><\/span>What Should Customers Send for a Fast PCBA Requote?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>Customers should send the current manufacturing package, build quantity, required date, and substitution rules. Complete inputs let us isolate the Microchip price impact without reopening unrelated parts of the project.<\/p>\n<ul>\n<li>Gerber or ODB++ files, current BOM, CPL, and assembly drawings.<\/li>\n<li>Build quantity, forecast quantity, target ship date, and delivery location.<\/li>\n<li>Approved vendor list, approved alternates, and do-not-substitute parts.<\/li>\n<li>Customer-owned or already purchased inventory with quantities and lot data.<\/li>\n<li>Firmware, programming, functional-test, and regulatory requirements.<\/li>\n<li>Any existing supplier quote or price-protection document that should be considered.<\/li>\n<\/ul>\n<p>Our <a href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/07\/pcb-assembly-manufacturer-rfq-checklist\/\">PCB assembly RFQ checklist<\/a> shows the information needed to align pricing, sourcing, assembly, inspection, and testing in one review.<\/p>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"FAQ_About_Semiconductor_Price_Increase_2026\"><\/span>FAQ About Semiconductor Price Increase 2026<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3>When did Microchip&#8217;s 2026 price increase take effect?<\/h3>\n<p>Supply-chain reports identify August 14, 2026, as the effective date for selected products.<\/p>\n<h3>What percentage did Microchip prices increase?<\/h3>\n<p>No single public percentage is verified for all affected parts. The correct figure must be calculated from comparable old and new quotes for the exact manufacturer part number.<\/p>\n<h3>Is the reported increase 15% or 20%?<\/h3>\n<p>Those figures appear in some secondary market reports, but we have not found a public Microchip notice confirming either as a portfolio-wide rate. We do not use them as universal PCBA cost inputs.<\/p>\n<h3>Are all Microchip components affected?<\/h3>\n<p>Microchip described selective increases across a broad portfolio. Each part number needs confirmation from the authorized commercial channel.<\/p>\n<h3>Did Microchip extend lead times because of the price increase?<\/h3>\n<p>No general lead-time extension has been officially tied to this price action. Availability and lead time must be checked separately by part and quantity.<\/p>\n<h3>Will every PCBA quote increase by the same percentage?<\/h3>\n<p>No. The PCBA delta depends on affected part value, quantity per board, build quantity, protected inventory, and the rest of the BOM.<\/p>\n<h3>Can a quote issued before August 14 still be used?<\/h3>\n<p>Only if it remains valid and the component price is protected or material has been committed. We reconfirm the commercial terms before order release.<\/p>\n<h3>Should customers buy extra Microchip stock immediately?<\/h3>\n<p>Not automatically. Demand, lifecycle, storage, cash, forecast accuracy, traceability, and obsolescence risk should be reviewed before a pre-buy.<\/p>\n<h3>Can we replace a Microchip part with another brand?<\/h3>\n<p>Possibly, but only after engineering verifies the device, package, firmware, qualification, test, and lifecycle requirements and the customer approves the change.<\/p>\n<h3>What information is needed to update a turnkey PCBA quote?<\/h3>\n<p>Send the latest BOM and manufacturing files, quantity, required date, approved alternatives, customer-owned inventory, and any price-protection evidence.<\/p>\n<\/section>\n\n\n\n<section>\n<h2><span class=\"ez-toc-section\" id=\"How_Can_EBest_Circuit_Support_Your_PCBA_Project\"><\/span>How Can EBest Circuit Support Your PCBA Project?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p>We can review your BOM files, recalculate the confirmed BOM delta, check authorized availability, identify approval risks, and align the material-ready date with PCB fabrication and SMT production. Send your current BOM, Gerber or ODB++, CPL, build quantity, and required date to <a href=\"mailto:sales@bestpcbs.com\">sales@bestpcbs.com<\/a> for a controlled PCBA requote.<\/p>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>Microchip pricing changed on August 14, 2026. See what is confirmed, how much PCBA cost may change, and whether component lead times are affected.<\/p>\n","protected":false},"author":623,"featured_media":33589,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[174],"tags":[7683,7682,7680,7684,7681],"class_list":["post-33593","post","type-post","status-publish","format-standard","hentry","category-bestpcb","tag-bom-cost-analysis","tag-electronic-component-procurement","tag-microchip-price-increase-2026","tag-pcb-bom-management","tag-semiconductor-price-increase-2026"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.10 - aioseo.com -->\n\t<meta name=\"description\" content=\"Microchip pricing changed on August 14, 2026. See what is confirmed, how much PCBA cost may change, and whether component lead times are affected.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Love PCB\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.10\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"PCB &amp; MCPCB - EBest PCB - More Technical Details &amp; News on PCB, MCPCB &amp; Ceramic PCB from EBest PCB\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Semiconductor Price Increase 2026: PCBA Cost and Lead-Time Impact\" \/>\n\t\t<meta property=\"og:description\" content=\"Microchip pricing changed on August 14, 2026. See what is confirmed, how much PCBA cost may change, and whether component lead times are affected.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2025\/08\/logo.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2025\/08\/logo.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-08-17T02:27:22+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-08-17T03:14:54+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Bestpcbs1\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@bestpcbs\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Semiconductor Price Increase 2026: PCBA Cost and Lead-Time Impact\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Microchip pricing changed on August 14, 2026. See what is confirmed, how much PCBA cost may change, and whether component lead times are affected.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@bestpcbs\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2016\/02\/logo.gif\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#blogposting\",\"name\":\"Semiconductor Price Increase 2026: PCBA Cost and Lead-Time Impact\",\"headline\":\"Microchip Price Increase 2026: PCBA Cost and Lead-Time Impact\",\"author\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/author\\\/seo\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/semiconductor-price-increase-2026-hero.jpg\",\"width\":1200,\"height\":800,\"caption\":\"Semiconductor Price Increase 2026 flowing through a PCBA BOM, quotation, and SMT production plan\"},\"datePublished\":\"2026-08-17T10:27:22+08:00\",\"dateModified\":\"2026-08-17T11:14:54+08:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#webpage\"},\"articleSection\":\"bestpcb, bom cost analysis, electronic component procurement, microchip price increase 2026, pcb bom management, semiconductor price increase 2026\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/category\\\/bestpcb\\\/#listItem\",\"name\":\"bestpcb\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/category\\\/bestpcb\\\/#listItem\",\"position\":2,\"name\":\"bestpcb\",\"item\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/category\\\/bestpcb\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#listItem\",\"name\":\"Microchip Price Increase 2026: PCBA Cost and Lead-Time Impact\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#listItem\",\"position\":3,\"name\":\"Microchip Price Increase 2026: PCBA Cost and Lead-Time Impact\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/category\\\/bestpcb\\\/#listItem\",\"name\":\"bestpcb\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/#organization\",\"name\":\"PCB & MCPCB - Best Technology\",\"description\":\"More Technical Details & News on PCB, MCPCB & Ceramic PCB from EBest PCB\",\"url\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/\",\"telephone\":\"+8675529091601\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/logo.png\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#organizationLogo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/Bestpcbs1\",\"https:\\\/\\\/twitter.com\\\/bestpcbs\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UCJsTR02i6mtLFnBBNC_i4bQ\\\/featured\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/best-pcb-technology\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/author\\\/seo\\\/#author\",\"url\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/author\\\/seo\\\/\",\"name\":\"Love PCB\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a7888223b6638d2aaf515046d034707e?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Love PCB\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#webpage\",\"url\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/\",\"name\":\"Semiconductor Price Increase 2026: PCBA Cost and Lead-Time Impact\",\"description\":\"Microchip pricing changed on August 14, 2026. See what is confirmed, how much PCBA cost may change, and whether component lead times are affected.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/author\\\/seo\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/author\\\/seo\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/semiconductor-price-increase-2026-hero.jpg\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#mainImage\",\"width\":1200,\"height\":800,\"caption\":\"Semiconductor Price Increase 2026 flowing through a PCBA BOM, quotation, and SMT production plan\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/2026\\\/08\\\/semiconductor-price-increase-2026\\\/#mainImage\"},\"datePublished\":\"2026-08-17T10:27:22+08:00\",\"dateModified\":\"2026-08-17T11:14:54+08:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/\",\"name\":\"PCB & MCPCB - Best Technology\",\"description\":\"More Technical Details & News on PCB, MCPCB & Ceramic PCB from EBest PCB\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.bestpcbs.com\\\/blog\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Semiconductor Price Increase 2026: PCBA Cost and Lead-Time Impact","description":"Microchip pricing changed on August 14, 2026. See what is confirmed, how much PCBA cost may change, and whether component lead times are affected.","canonical_url":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#blogposting","name":"Semiconductor Price Increase 2026: PCBA Cost and Lead-Time Impact","headline":"Microchip Price Increase 2026: PCBA Cost and Lead-Time Impact","author":{"@id":"https:\/\/www.bestpcbs.com\/blog\/author\/seo\/#author"},"publisher":{"@id":"https:\/\/www.bestpcbs.com\/blog\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2026\/08\/semiconductor-price-increase-2026-hero.jpg","width":1200,"height":800,"caption":"Semiconductor Price Increase 2026 flowing through a PCBA BOM, quotation, and SMT production plan"},"datePublished":"2026-08-17T10:27:22+08:00","dateModified":"2026-08-17T11:14:54+08:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#webpage"},"isPartOf":{"@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#webpage"},"articleSection":"bestpcb, bom cost analysis, electronic component procurement, microchip price increase 2026, pcb bom management, semiconductor price increase 2026"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/www.bestpcbs.com\/blog#listItem","position":1,"name":"Home","item":"https:\/\/www.bestpcbs.com\/blog","nextItem":{"@type":"ListItem","@id":"https:\/\/www.bestpcbs.com\/blog\/category\/bestpcb\/#listItem","name":"bestpcb"}},{"@type":"ListItem","@id":"https:\/\/www.bestpcbs.com\/blog\/category\/bestpcb\/#listItem","position":2,"name":"bestpcb","item":"https:\/\/www.bestpcbs.com\/blog\/category\/bestpcb\/","nextItem":{"@type":"ListItem","@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#listItem","name":"Microchip Price Increase 2026: PCBA Cost and Lead-Time Impact"},"previousItem":{"@type":"ListItem","@id":"https:\/\/www.bestpcbs.com\/blog#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#listItem","position":3,"name":"Microchip Price Increase 2026: PCBA Cost and Lead-Time Impact","previousItem":{"@type":"ListItem","@id":"https:\/\/www.bestpcbs.com\/blog\/category\/bestpcb\/#listItem","name":"bestpcb"}}]},{"@type":"Organization","@id":"https:\/\/www.bestpcbs.com\/blog\/#organization","name":"PCB & MCPCB - Best Technology","description":"More Technical Details & News on PCB, MCPCB & Ceramic PCB from EBest PCB","url":"https:\/\/www.bestpcbs.com\/blog\/","telephone":"+8675529091601","logo":{"@type":"ImageObject","url":"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2025\/08\/logo.png","@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#organizationLogo"},"image":{"@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/Bestpcbs1","https:\/\/twitter.com\/bestpcbs","https:\/\/www.youtube.com\/channel\/UCJsTR02i6mtLFnBBNC_i4bQ\/featured","https:\/\/www.linkedin.com\/company\/best-pcb-technology"]},{"@type":"Person","@id":"https:\/\/www.bestpcbs.com\/blog\/author\/seo\/#author","url":"https:\/\/www.bestpcbs.com\/blog\/author\/seo\/","name":"Love PCB","image":{"@type":"ImageObject","@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/a7888223b6638d2aaf515046d034707e?s=96&d=mm&r=g","width":96,"height":96,"caption":"Love PCB"}},{"@type":"WebPage","@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#webpage","url":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/","name":"Semiconductor Price Increase 2026: PCBA Cost and Lead-Time Impact","description":"Microchip pricing changed on August 14, 2026. See what is confirmed, how much PCBA cost may change, and whether component lead times are affected.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/www.bestpcbs.com\/blog\/#website"},"breadcrumb":{"@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#breadcrumblist"},"author":{"@id":"https:\/\/www.bestpcbs.com\/blog\/author\/seo\/#author"},"creator":{"@id":"https:\/\/www.bestpcbs.com\/blog\/author\/seo\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2026\/08\/semiconductor-price-increase-2026-hero.jpg","@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#mainImage","width":1200,"height":800,"caption":"Semiconductor Price Increase 2026 flowing through a PCBA BOM, quotation, and SMT production plan"},"primaryImageOfPage":{"@id":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/#mainImage"},"datePublished":"2026-08-17T10:27:22+08:00","dateModified":"2026-08-17T11:14:54+08:00"},{"@type":"WebSite","@id":"https:\/\/www.bestpcbs.com\/blog\/#website","url":"https:\/\/www.bestpcbs.com\/blog\/","name":"PCB & MCPCB - Best Technology","description":"More Technical Details & News on PCB, MCPCB & Ceramic PCB from EBest PCB","inLanguage":"en-US","publisher":{"@id":"https:\/\/www.bestpcbs.com\/blog\/#organization"}}]},"og:locale":"en_US","og:site_name":"PCB &amp; MCPCB - EBest PCB - More Technical Details &amp; News on PCB, MCPCB &amp; Ceramic PCB from EBest PCB","og:type":"article","og:title":"Semiconductor Price Increase 2026: PCBA Cost and Lead-Time Impact","og:description":"Microchip pricing changed on August 14, 2026. See what is confirmed, how much PCBA cost may change, and whether component lead times are affected.","og:url":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/","og:image":"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2025\/08\/logo.png","og:image:secure_url":"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2025\/08\/logo.png","article:published_time":"2026-08-17T02:27:22+00:00","article:modified_time":"2026-08-17T03:14:54+00:00","article:publisher":"https:\/\/www.facebook.com\/Bestpcbs1","twitter:card":"summary_large_image","twitter:site":"@bestpcbs","twitter:title":"Semiconductor Price Increase 2026: PCBA Cost and Lead-Time Impact","twitter:description":"Microchip pricing changed on August 14, 2026. See what is confirmed, how much PCBA cost may change, and whether component lead times are affected.","twitter:creator":"@bestpcbs","twitter:image":"https:\/\/www.bestpcbs.com\/blog\/wp-content\/uploads\/2016\/02\/logo.gif"},"aioseo_meta_data":{"post_id":"33593","title":"Semiconductor Price Increase 2026: PCBA Cost and Lead-Time Impact","description":"Microchip pricing changed on August 14, 2026. See what is confirmed, how much PCBA cost may change, and whether component lead times are affected.","keywords":null,"keyphrases":{"focus":{"keyphrase":"semiconductor price increase 2026","score":69,"analysis":{"keyphraseInTitle":{"score":9,"maxScore":9,"error":0},"keyphraseInDescription":{"score":3,"maxScore":9,"error":1},"keyphraseLength":{"score":9,"maxScore":9,"error":0,"length":4},"keyphraseInURL":{"score":5,"maxScore":5,"error":0},"keyphraseInIntroduction":{"score":9,"maxScore":9,"error":0},"keyphraseInSubHeadings":{"score":3,"maxScore":9,"error":1},"keyphraseInImageAlt":{"score":9,"maxScore":9,"error":0},"keywordDensity":{"score":0,"type":"low","maxScore":9,"error":1}}},"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"created":"2026-08-17 02:27:22","updated":"2026-08-17 04:01:17","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.bestpcbs.com\/blog\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.bestpcbs.com\/blog\/category\/bestpcb\/\" title=\"bestpcb\">bestpcb<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tMicrochip Price Increase 2026: PCBA Cost and Lead-Time Impact\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.bestpcbs.com\/blog"},{"label":"bestpcb","link":"https:\/\/www.bestpcbs.com\/blog\/category\/bestpcb\/"},{"label":"Microchip Price Increase 2026: PCBA Cost and Lead-Time Impact","link":"https:\/\/www.bestpcbs.com\/blog\/2026\/08\/semiconductor-price-increase-2026\/"}],"_links":{"self":[{"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/posts\/33593","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/users\/623"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/comments?post=33593"}],"version-history":[{"count":1,"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/posts\/33593\/revisions"}],"predecessor-version":[{"id":33613,"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/posts\/33593\/revisions\/33613"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/media\/33589"}],"wp:attachment":[{"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/media?parent=33593"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/categories?post=33593"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bestpcbs.com\/blog\/wp-json\/wp\/v2\/tags?post=33593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}